Skip to content

WIP

WIP #1223

Triggered via push September 22, 2023 22:16
Status Cancelled
Total duration 2m 45s
Artifacts

tests.yml

on: push
Matrix: Backend Checks
Matrix: Backend Tests
Matrix: Installation Test
Fit to window
Zoom out
Zoom in

Annotations

16 errors
Backend Checks (3.10, ruff)
Process completed with exit code 2.
Backend Checks (3.11, ruff)
Process completed with exit code 2.
Backend Checks (3.9, ruff)
Process completed with exit code 2.
Backend Tests (3.9, windows-2022)
Process completed with exit code 1.
Frontend Checks
The run was canceled by @treiher.
Frontend Checks
The operation was canceled.
End-to-End Tests
The run was canceled by @treiher.
End-to-End Tests
The operation was canceled.
Installation Test (3.11)
The run was canceled by @treiher.
Installation Test (3.11)
The operation was canceled.
Installation Test (3.10)
The run was canceled by @treiher.
Installation Test (3.10)
The operation was canceled.
Installation Test (3.9)
The run was canceled by @treiher.
Installation Test (3.9)
The operation was canceled.
Frontend Tests
The run was canceled by @treiher.
Frontend Tests
The operation was canceled.