Skip to content

Update default.yml

Update default.yml #63

Triggered via push October 3, 2023 11:15
Status Failure
Total duration 26s
Artifacts

default.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

34 errors
P8.1 - L10.* - prefer-stable - ubuntu-latest
The "--prefer-stable" option does not exist.
P8.1 - L10.* - prefer-stable - ubuntu-latest
Process completed with exit code 1.
P8.1 - L9.* - prefer-stable - ubuntu-latest
The "--prefer-stable" option does not exist.
P8.1 - L9.* - prefer-stable - ubuntu-latest
Process completed with exit code 1.
P8.2 - L9.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_1_9___p_2" failed.
P8.2 - L9.* - prefer-lowest - ubuntu-latest
The "--prefer-lowest" option does not exist.
P8.2 - L9.* - prefer-lowest - ubuntu-latest
Process completed with exit code 1.
P8.2 - L9.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_1_9___p_2" failed.
P8.2 - L9.* - prefer-stable - ubuntu-latest
The "--prefer-stable" option does not exist.
P8.2 - L9.* - prefer-stable - ubuntu-latest
Process completed with exit code 1.
P8.1 - L10.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_1_9___p_2" failed.
P8.1 - L10.* - prefer-lowest - windows-latest
The operation was canceled.
P8.1 - L9.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_1_9___p_2" failed.
P8.2 - L9.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_1_9___p_2" failed.
P8.1 - L9.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.2 - L9.* - prefer-stable - windows-latest
The operation was canceled.
P8.2 - L10.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_1_9___p_2" failed.
P8.2 - L10.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.1 - L9.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_1_9___p_2" failed.
P8.1 - L9.* - prefer-lowest - windows-latest
The operation was canceled.
P8.2 - L10.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_1_9___p_2" failed.
P8.2 - L10.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.2 - L9.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_1_9___p_2" failed.
P8.2 - L9.* - prefer-lowest - windows-latest
The operation was canceled.
P8.1 - L9.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_1_9___p_2" failed.
P8.1 - L9.* - prefer-stable - windows-latest
The operation was canceled.
P8.1 - L10.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_1_9___p_2" failed.
P8.1 - L10.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.2 - L10.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_1_9___p_2" failed.
P8.2 - L10.* - prefer-stable - windows-latest
The operation was canceled.
P8.2 - L10.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_1_9___p_2" failed.
P8.2 - L10.* - prefer-lowest - windows-latest
The operation was canceled.
P8.1 - L10.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_1_9___p_2" failed.
P8.1 - L10.* - prefer-stable - windows-latest
The operation was canceled.