Skip to content

Forcing a load of the baseline #253

Forcing a load of the baseline

Forcing a load of the baseline #253

Triggered via push July 19, 2024 09:30
Status Failure
Total duration 43s
Artifacts

tests.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 1 warning
build (ubuntu-latest)
Process completed with exit code 1.
build (macos-latest)
The job was canceled because "ubuntu-latest" failed.
build (macos-latest)
The operation was canceled.
build (ubuntu-latest)
The following actions uses Node.js version which is deprecated and will be forced to run on node20: actions/checkout@v3. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/