Upgrade morango. #7
morango_integration.yml
on: pull_request
Path match check
5s
Morango Integration Tests with PostgreSQL
16m 29s
Matrix: Morango Integration Tests
Annotations
12 errors
Morango Integration Tests (3.11)
Process completed with exit code 1.
|
Morango Integration Tests (3.9)
The job was canceled because "_3_11" failed.
|
Morango Integration Tests (3.9)
The operation was canceled.
|
Morango Integration Tests (3.10)
The job was canceled because "_3_11" failed.
|
Morango Integration Tests (3.10)
The operation was canceled.
|
Morango Integration Tests (3.8)
The job was canceled because "_3_11" failed.
|
Morango Integration Tests (3.8)
The operation was canceled.
|
Morango Integration Tests (3.7)
The job was canceled because "_3_11" failed.
|
Morango Integration Tests (3.7)
The operation was canceled.
|
Morango Integration Tests (3.6)
The job was canceled because "_3_11" failed.
|
Morango Integration Tests (3.6)
The operation was canceled.
|
Morango Integration Tests with PostgreSQL
Process completed with exit code 1.
|