Skip to content

188 kubeconfig context override #651

188 kubeconfig context override

188 kubeconfig context override #651

Triggered via pull request August 16, 2023 07:18
Status Failure
Total duration 1h 1m 0s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

ci.yml

on: pull_request
Matrix: Build and Test
Matrix: Submit Dependencies
Matrix: Generate Site
Matrix: post build
Matrix: Publish Artifacts
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Build and Test (ubuntu-latest, 3, temurin@11, rootJS)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
Build and Test (ubuntu-latest, 3, temurin@11, rootJS)
The operation was canceled.
Build and Test (ubuntu-latest, 3, temurin@11, rootNative)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
Build and Test (ubuntu-latest, 3, temurin@11, rootNative)
The operation was canceled.
Build and Test (ubuntu-latest, 2.13, temurin@11, rootNative)
The hosted runner: GitHub Actions 2 lost communication with the server. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
Build and Test (ubuntu-latest, 3, temurin@11, rootJVM)
The job running on runner GitHub Actions 15 has exceeded the maximum execution time of 60 minutes.
Build and Test (ubuntu-latest, 3, temurin@11, rootJVM)
The operation was canceled.