Skip to content

recovery wip

recovery wip #16

Triggered via push March 20, 2024 17:55
Status Failure
Total duration 3m 15s
Billable time 19m
Artifacts

test.yml

on: push
Matrix: cross
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
test (stable, ubuntu-latest)
Process completed with exit code 101.
test (1.74.0, ubuntu-latest)
Process completed with exit code 101.
test (1.74.0, windows-latest)
The job was canceled because "stable_ubuntu-latest" failed.
test (1.74.0, windows-latest)
The operation was canceled.
test (stable, windows-latest)
The job was canceled because "stable_ubuntu-latest" failed.
test (stable, windows-latest)
The operation was canceled.
test (stable, macos-latest)
The job was canceled because "stable_ubuntu-latest" failed.
test (stable, macos-latest)
The operation was canceled.
test (1.74.0, macos-latest)
The job was canceled because "stable_ubuntu-latest" failed.
test (1.74.0, macos-latest)
The operation was canceled.