Hopefully successful merge #9
main.yml
on: push
Test on MacOS
1m 47s
Test on Windows
2m 46s
Matrix: linux
Annotations
10 errors
Test on Ubuntu (Elixir 1.15.7, OTP 24.3)
Process completed with exit code 1.
|
Test on Ubuntu (Elixir 1.15.7, OTP 25.3)
Process completed with exit code 1.
|
Test on Ubuntu (Elixir 1.14.5, OTP 25.3)
The job was canceled because "_1_15_7_24_3" failed.
|
Test on Ubuntu (Elixir 1.12.3, OTP 23.3)
The job was canceled because "_1_15_7_24_3" failed.
|
Test on Ubuntu (Elixir 1.13.4, OTP 23.3)
The job was canceled because "_1_15_7_24_3" failed.
|
Test on Ubuntu (Elixir 1.13.4, OTP 22.3)
The job was canceled because "_1_15_7_24_3" failed.
|
Test on Ubuntu (Elixir 1.14.5, OTP 24.3)
The job was canceled because "_1_15_7_24_3" failed.
|
Test on Ubuntu (Elixir 1.16.0-rc.0, OTP 25.3)
The job was canceled because "_1_15_7_24_3" failed.
|
Test on Ubuntu (Elixir 1.15.7, OTP 26.1)
The job was canceled because "_1_15_7_24_3" failed.
|
Test on Ubuntu (Elixir 1.15.7, OTP 26.1)
The operation was canceled.
|