Skip to content

feat: start testing on Bazel 8 #1138

feat: start testing on Bazel 8

feat: start testing on Bazel 8 #1138

Triggered via pull request October 25, 2024 17:29
Status Cancelled
Total duration 3m 46s
Artifacts

ci.yaml

on: pull_request
bazel-test  /  matrix-prep-os
0s
bazel-test / matrix-prep-os
bazel-test  /  matrix-prep-bazelversion
3s
bazel-test / matrix-prep-bazelversion
integration-test
3m 34s
integration-test
Matrix: bazel-test / test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
bazel-test / test (ubuntu-latest, 8.0.0rc1, ., true)
Process completed with exit code 1.
bazel-test / test (ubuntu-latest, 8.0.0rc1, example, true)
Process completed with exit code 1.
bazel-test / test (ubuntu-latest, 8.0.0rc1, example, false)
Process completed with exit code 1.
bazel-test / test (ubuntu-latest, 7.1.1, ., true)
Process completed with exit code 3.
bazel-test / test (ubuntu-latest, 7.1.1, example, true)
Canceling since a higher priority waiting request for 'concurrency-group::CI::pr-407' exists
bazel-test / test (ubuntu-latest, 7.1.1, example, true)
The operation was canceled.
integration-test
Canceling since a higher priority waiting request for 'concurrency-group::CI::pr-407' exists
integration-test
The operation was canceled.
bazel-test / test (ubuntu-latest, 7.1.1, example, false)
Canceling since a higher priority waiting request for 'concurrency-group::CI::pr-407' exists
bazel-test / test (ubuntu-latest, 7.1.1, example, false)
The operation was canceled.