build(deps): bump golang from 1.20.7-alpine3.18 to 1.21.5-alpine3.18 #15
ci.yaml
on: push
Matrix: Build Docker
Pre-commit Check
3m 23s
Semantic Release
0s
Annotations
3 errors
Build Docker (sulfone-boron-arm, Dockerfile, ., linux/arm)
Process completed with exit code 1.
|
Build Docker (sulfone-boron-amd, Dockerfile, ., linux/amd64)
The job was canceled because "sulfone-boron-arm_Dockerf" failed.
|
Build Docker (sulfone-boron-amd, Dockerfile, ., linux/amd64)
The operation was canceled.
|