Hello Dr. Cui
I am facing a time convergence issues while making line connection and isolation. Kindly suggest the solution. The description of the issues are as follows
The issues remains same for both the scenarios.
Scenario: 1
A line is connecting two power system network which have indivisual slack buses. Initially
Line.u=1
, simulation is started, Initialization was successful. TDS(TDS.config.tf=40)
was running fine.when line is disconnected (
Line.u=0
), ran the simulation (TDS.config.tf=60
) and TDS was completed successfully.Scenarios:1
Then I reconnected the Line (
Line.u=1
) and ran the TDS (TDS.config.tf=80
),TDS was terminated as Time step reduced to zero. Convergence is not likely.
The error massage was listed below.Scenario: 2
I thought, this error may be due to different voltage and frequecy of the intrconnecting buses. Hence I made the load active power and reactive at one side and tried to bring down the one of the interconnecting bus volatge and frequency approxmiatly equal to the other interconnecting bus voltage. Then I reconnected the line (
Line.u=1
). However, the error remain same, i.eTDS was terminated as Time step reduced to zero. Convergence is not likely
. The error massage was listed below.The error massage are as follows
Regards